Language: EN
Concept image showing generator sets and synchronizing control panels
EDR OTOMASYON · OUR SERVICES

Generator Synchronization Systems

Manage your power with confidence.

Synchronization, synchronizing panels and automation for coordinated operation of generator and transformer systems. We address your commissioning and on-site technical support needs together.

01 — SYNCHRONIZATION

What is generator synchronization?

Generator synchronization brings the voltage, frequency and phase conditions of electrical sources into alignment for parallel operation. Source connection, monitoring and control are coordinated with the system operating sequence.

EDR Otomasyon develops synchronization and control applications for generator and transformer systems according to project requirements.

01

Generator synchronizing panels

A synchronizing panel monitors sources and breaker positions and performs control functions according to the operating sequence. Panel automation supports the coordinated operation of the system.

SYNCHRONIZING PANELS
02

Generator automation

Monitoring and controlling generator operating status is part of power automation. The control sequence determines when sources connect and how they operate together.

MONITORING & CONTROL
03

Transformer-generator synchronization

Coordinated operation of the transformer-fed supply and generators depends on the plant electrical architecture and operating sequence. Synchronization and panel controls manage coordination between sources.

SOURCE COORDINATION
02 — FIELD APPLICATIONS

Commissioning and on-site technical support

Operating sequence checks

Commissioning covers site inspections, operating sequence tests and bringing the system into service. Coordinated operation of the generator, synchronizing panel and automation system is the focus of this process.

Troubleshooting and technical support

We provide on-site fault diagnosis and support for synchronization, panels and power automation. We assess your needs based on the existing system and the issue encountered.

Brands we use

For synchronization and power control systems.

  • DEIF
  • ComAp
  • WOODWARD
03 — YOUR PROJECT

Let’s discuss your project.

Discuss your generator synchronizing panel, commissioning or troubleshooting requirements with EDR Otomasyon.

Contact us using the details below. We can review your system and operating requirements together.

Get in touch