Generator Synchronization Simulator

1. Match frequency and voltage. 2. Bring the needle close to 0°. 3. Close the G2 breaker, or try Automatic synchronization. Drag the control up or down. Hold Shift for fine adjustment, use the −/+ buttons, or enter a value and press Enter.

EDR · Synchronization lab

Educational simulation
G2 breaker openG1 is supplying the busbar
G1G2 I · ClosedO · Open COMMON BUSBAR · FACILITY LOAD
EDRSYNCHROSCOPE 0° −90°+90°180° SYNCHRONIZED±10° ↶ SLOWFAST ↷ PHASE ANGLE+110.0° SLIP+0.25 Hz G2 fast → HIGH FREQUENCY DIFFERENCE

G1 · Busbar reference

45.0055.00 Hz
Step: 0.01 Hz
360440 VAC
Step: 1 VAC

G2 · Generator to synchronize

45.0055.00 Hz
Step: 0.01 Hz
360440 VAC
Step: 1 VAC

Control ring: Green · Safe range / Red · 5% alarm zone

G1 · No alarm
G2 · No alarm
Match the frequencies, then close the breaker when the needle enters the window at the top.

G1 · 400 kWG2 · 0 kW
Example closing window: |Δf| ≤ 0.10 Hz · |ΔU| ≤ 5% · |Δφ| ≤ 10°. Identical phase sequence is assumed. Protection scenario after synchronization: f < 47.5 or > 52.5 Hz triggers the scenario’s “Reverse low power” alarm; U < 380 or > 420 VAC triggers “Overcurrent”. The relevant generator breaker opens. Boundary values remain permitted. Alarms persist until reset. This is a custom training scenario, not an actual power/current protection calculation.